Welcome to visitShandong Duxiu road maintenance technology Co., Ltd.

  • E-MAIL:info@bitumenequ.com
  • Telephone:+86-18253441007

CURRENT:HOME>PRODUCT

Asphalt dumping equipment

Asphalt barrel removal equipment is mainly composed of barrel removal box, lifting mechanism, hydraulic thruster, heat conduction oil heating system, heat conduction oil pipeline system and electrical control system.

Contact +86-18253441007

Equipment structure principle:


Asphalt barrel removal equipment is mainly composed of barrel removal box, lifting mechanism, hydraulic thruster, heat conduction oil heating system, heat conduction oil pipeline system and electrical control system.


The box is divided into upper and lower chambers. The upper chamber is a barreled asphalt melting chamber. Heating coils are distributed around it. The heating tube and the asphalt barrel mainly exchange heat by radiation to achieve the purpose of removing the asphalt barrel. The two guide rails enter the asphalt barrel. trail of. The lower chamber mainly talks about the continued heating of the asphalt released from the barrel. Make the temperature reach the pumping temperature (100°C) and start the asphalt pump after the asphalt reaches a certain temperature, pass through the asphalt pipeline system, come out from one end of the debarrel, and drive into the other end of the debarrel for circulation, so that the temperature can be circulated. It can also be dehydrated and pumped into the asphalt storage tank after it has basically reached the operating temperature and is free of moisture.


In the asphalt pipeline system, a filter device is installed to automatically remove the slag contained in the barrel of asphalt. The lifting mechanism adopts a cantilever structure. The asphalt barrel is hoisted by an electric hoist. The asphalt barrel is placed on the turning platform through the movement of the rotating crane. The barrel is turned over from the turning platform to the opening downward, and the barrel is pushed into the asphalt melting chamber by the hydraulic cylinder.


Main performance:

The output of this equipment is 8-10T/h, and it adopts a closed container structure with automatic telescopic doors;

The maximum thrust of the hydraulic cylinder is 8 tons;

The barrel can be taken off quickly. According to the principle of layered heating, four-layer heating technology is adopted; high-quality rock wool is used for heat preservation; environmental protection.


Technical Parameters:

Project

Unit

Parameter

Remarks

Productivity

T/h

8-10


Asphalt temperature

Above 110℃


Asphalt storage capacity

T

More than 15 tons


Hydraulic system pressure

mpa

15-20 adjustable


Hydraulic pump




Hydraulic cylinder




Maximum thrust




Dimensions


11.8*2.2*2.5